Seismic Performance Assessment of Existing Buildings: From Knowledge Level to Structural Decision
Seismic performance assessment of an existing structure is not simply a matter of solving an analysis model. Identifying the structural system on site, establishing the Knowledge Level, verifying material properties and member details, selecting the appropriate analysis method, and translating the resulting demands into a building-level performance decision are all parts of the same engineering process.
1. Why Is Existing-Building Assessment Different from New-Building Design?
In the design of a new structure, the engineer defines the structural layout, member dimensions, material properties and load-transfer mechanism before the structure is built. The analysis model is, to a large extent, the mathematical representation of these design decisions made by the engineer.
For an existing building, the problem is reversed.
The engineer must first determine what the structure in front of them actually is.
Structural design documents may be available in the archives, but the structure on site may differ from the drawings. Member dimensions may have changed, structural members may have been built in different locations, new openings may have been introduced during use, some members may have been removed or added, or repairs and other interventions may have been carried out.
For this reason, the first engineering problem in existing-building assessment is not selecting the analysis method, but defining the physical structural system to be assessed with sufficient reliability.
For the same reason, the existing-building approach of the Turkish Building Earthquake Code (TBDY 2018) does not focus solely on the analytical model. Under Chapter 15, building geometry, structural-system characteristics, member details, material properties, the foundation system, existing damage and previous interventions are all part of the information-gathering process. Even at the Limited Knowledge Level, the structural-system plan survey is expected to be obtained through fieldwork; existing architectural drawings may be used as supporting information.
Accordingly, two concepts must be distinguished in existing-building studies:
The structure described in the archive documents and the structure that actually exists on site.
The archived design can be an extremely valuable source of information. For the assessment model, however, the essential task is to verify the extent to which that information corresponds to the existing physical system.
The existing design documents are not the existing building itself.
This distinction affects the entire performance-assessment process.
Model complexity alone does not provide reliability
It can be misleading to assume that a more advanced analysis method will automatically produce more reliable results for an existing structure.
If the actual cross-section of a column is defined incorrectly, the reinforcement arrangement does not reflect reality, a discontinuity present in the structure is omitted from the model, or the behaviour of an existing connection is idealised incorrectly, the mathematical sophistication of the analysis model does not eliminate the problem in the input data.
A reliable assessment chain should be established according to the following logic:
Actual structure → verified data → engineering model → analysis → performance assessment → engineering decision
Uncertainties in the first links of this chain propagate through all subsequent stages.
For this reason, the starting point of seismic performance assessment of an existing structure is not the computer model, but the structure itself.
2. The Scope of the Assessment Must First Be Defined Correctly
In practice, the term “seismic performance analysis” may be used for studies carried out for different purposes. However, not every investigation of a structure represents the same engineering problem.
Chapter 15 of TBDY 2018 sets out the principles and retrofit approach for assessing the performance of existing buildings, buildings to be retrofitted, and building-type structures under earthquake effects. Non-building structures, as well as registered structures and monuments of historical or cultural significance, are outside the scope of Chapter 15.
Performance assessment and post-earthquake damage assessment are not the same process
This distinction is particularly important.
TBDY 15.1.6 explicitly states that, after an earthquake has caused damage to a building, the seismic safety of the damaged building cannot be determined using the methods of Chapter 15. In other words, assessing existing post-earthquake damage and carrying out an existing-building performance assessment under Chapter 15 are not the same study.
The following questions must therefore be distinguished from one another:
- What damage occurred in the building after an earthquake?
- Given the building’s existing physical characteristics, what performance is it expected to exhibit under a specified level of earthquake ground motion?
- After a retrofit intervention, is the target performance level achieved?
Although these questions may use some of the same data, they do not represent the same assessment procedure.
The structural type also affects the assessment method
Chapter 15 does not prescribe the same capacity calculation for every type of existing structure. For example, capacity calculations for existing steel buildings refer to the relevant TBDY provisions for new steel buildings, while precast reinforced-concrete structures refer to the relevant design chapters; however, information on the existing structure is still compiled in accordance with the principles of Chapter 15.
For this reason, three questions should be answered clearly before a performance study begins:
What is the structure? What is the purpose of the assessment? Which regulatory and methodological scope applies?
A detailed analysis model developed before the scope has been defined correctly risks applying the right method to the wrong problem.
3. The Basis of the Assessment: Collecting the Right Information from the Building
One of the most critical stages in assessing the performance of an existing structure is the information-gathering process.
This process is not limited to preparing plans or taking concrete samples. Structural geometry, member dimensions, the foundation system, material properties, member details, existing damage and previous modifications must be considered together.
Even at the Limited Knowledge Level, TBDY requires the building geometry to be established through fieldwork and sufficient information on the structural system to be obtained for development of the analytical model.
A structural survey is more than a geometric drawing
The survey prepared for a performance study should not be limited to showing only the plan locations of columns, shear walls and beams.
Member dimensions, storey heights, spans, slab and partition arrangements, structural-system continuity and geometric features that may alter behaviour should be established in sufficient detail to enable modelling.
For example, a condition that could create short-column behaviour should not be treated merely as an architectural detail. TBDY 15.4.8 requires columns defined as short columns to be represented in the analytical model using their actual clear lengths.
Foundation system and ground conditions
Correctly defining the superstructure is not enough; the system through which the structure is connected to the ground is also important.
Where ground deformations may affect structural behaviour, TBDY requires the relevant ground characteristics to be reflected in the analytical model.
This does not mean that detailed soil–structure interaction must necessarily be modelled for every existing building. However, where foundation and ground effects may make a meaningful contribution to performance behaviour, they should not be disregarded automatically.
Existing damage and previous interventions
Structures can change over their service lives.
Corrosion, section loss, previous repairs, openings that have been created, members that have been removed or added, and other interventions to the structural system are all part of the physical structure at the time of assessment.
If a defect or intervention identified during the site investigation materially affects the stiffness, capacity or load-transfer mechanism of the structural system, that effect should be reflected in the assessment model or the relevant capacity calculation through an appropriate engineering idealisation.
The objective is not to reproduce every physical crack individually in the finite-element model. The objective is to ensure that existing conditions that alter structural behaviour are not lost in the calculation.
4. Knowledge Level: Carrying Uncertainty into the Engineering Assessment
It is often impossible to know every characteristic of an existing building with the same certainty as for a newly designed structure.
TBDY does not leave this uncertainty merely as a note in the report; it classifies the extent of the information obtained about the structure as the Limited Knowledge Level or the Comprehensive Knowledge Level. The Limited Knowledge Level may be used only for “Other Buildings” within BKS=3, while the Comprehensive Knowledge Level is based on more extensive measurement and verification.
Knowledge Level is not merely a report heading
The Knowledge Level has a direct effect on capacity assessment.
According to TBDY Table 15.1, the Knowledge Level Factor applied to member capacities is defined as 0.75 for the Limited Knowledge Level and 1.00 for the Comprehensive Knowledge Level.
Accordingly, the terms “Limited” and “Comprehensive” are not classifications used only on the cover of a report.
The extent to which information about the structure has been verified becomes an engineering parameter that carries through to the capacity calculation.
More information is not merely a higher factor
The engineering value of the Comprehensive Knowledge Level is not limited to the factor of 1.00.
More extensive fieldwork allows a greater proportion of the assumptions concerning geometry, reinforcement, material properties, connections and existing modifications to be verified.
The principal benefit, therefore, is not only the change in the capacity factor, but also the reduction in uncertainty regarding what the assessed structure actually is.
In existing-structure assessment, the reliability of the analysis model depends first on the reliability of the information about the structure, not on the complexity of the model.
EXISTING DOCUMENTS
ARCHIVE DRAWINGS
FIELD VERIFICATION
AS-BUILT SURVEY
ELEMENT DIMENSIONS
MATERIAL & DETAIL DATA
MATERIAL DATA
REINFORCEMENT / CONNECTION
EXISTING DEFECTS
INFORMATION LEVEL
LIMITED — 0.75
BKS=3 only
COMPREHENSIVE — 1.00
ASSESSMENT MODEL
5. Why Are Material Properties and Member Details Critical?
The performance of an existing structure cannot be assessed from knowledge of the structural geometry alone.
Two structures with the same member dimensions may not exhibit the same capacity and deformation behaviour if they differ in concrete strength, reinforcement arrangement, connection details or existing deterioration.
For capacity calculations, TBDY addresses material properties through the concept of “existing material strength” and requires the strengths determined for the existing structure to be used in member-capacity calculations.
Concrete strength alone does not define building behaviour
Core-test results are an important source of data for existing reinforced-concrete structures. However, it is incorrect to equate a performance study with core testing.
The behaviour of a reinforced-concrete member is governed not only by the concrete compressive strength, but also by longitudinal reinforcement, transverse reinforcement, reinforcement grade, anchorage, lap splices, section geometry and existing deterioration.
Accordingly:
A core-test result is not a building-performance result.
Core testing contributes to determining the properties of the existing concrete. The performance decision, however, is reached by assessing this information within the behaviour of the structural system as a whole.
Reinforcement arrangement is part of load transfer
Knowing only the total reinforcement area in a reinforced-concrete member is not sufficient.
Where the reinforcement is located, where it continues, the anchorage and lap-splice conditions, and the arrangement of transverse reinforcement can directly affect behaviour.
TBDY 15.4.13 requires deficiencies in anchorage or lap length to be reflected in the capacity calculation.
For this reason, the correct question is not simply:
“How much reinforcement is there?”
but rather:
“Through what mechanism and detailing can this reinforcement transfer force?”
That is the question that must be asked.
Connection information in steel structures is system information
In steel structures, defining only the member sections is not sufficient.
Connection geometry, bolts, welds, bracing connections and existing fabrication details can affect the actual load-transfer and stiffness behaviour of the members.
Accordingly, in assessing an existing steel structure, identifying the member section and understanding how that member is connected into the system are parts of the same assessment chain.
6. How Should the Analysis Model of an Existing Structure Be Developed?
After information gathering and material characterisation, the resulting data are translated into the structural model.
TBDY 15.4.5 requires the structural-system model to be developed with sufficient accuracy to calculate the internal forces, displacements and deformations that occur under vertical loads and earthquake effects.
A good model must therefore do more than resemble the structure geometrically; it must also represent, with sufficient accuracy, the physical assumptions that govern behaviour.
Actual geometry
It is important that grid lines, column clear lengths, shear-wall locations, spans and storey heights are transferred correctly into the model.
If there is a difference between idealised architectural grid geometry and actual structural behaviour, the purpose of the model should be to represent behaviour rather than imitate the drawing.
Diaphragm assumption
Defining a slab as a rigid diaphragm is not merely an analysis-software option; it is an assumption about physical behaviour.
TBDY 15.4.6 governs the representation of storey motion, in buildings where rigid-diaphragm behaviour is assumed, by horizontal translations and rotation about the vertical axis.
Accordingly, in structures with large openings, narrow slab connections or significant plan irregularities, diaphragm behaviour should be assessed from the characteristics of the system rather than assumed by habit.
Effective section stiffnesses
In existing reinforced-concrete systems, the stiffness assumption is an important input to the performance result.
TBDY 15.4.11 requires effective cracked-section stiffnesses to be used for reinforced-concrete members subjected to flexure.
This assumption can affect structural periods, displacements and the distribution of forces among members.
For this reason, when assessing the behaviour of an existing structure, taking only the strengths as “existing” while leaving stiffnesses at ideal gross-section values may fail to represent some aspects of the system realistically.
Model complexity should be commensurate with information quality
The most detailed model is not always the most reliable model.
An analysis that appears to define numerous parameters with high precision even though those parameters are not actually known can create a false sense of certainty.
A good performance model preserves data that can be verified on site, represents features that affect behaviour, and contains the level of detail required by the selected analysis method.
7. Seismic Demand and Performance Target
Before the analysis model is developed for a performance assessment, the following question must be answered:
Under what level of earthquake ground motion, and for what performance target, is the structure being assessed?
The question “Is the building earthquake-resistant?” is not, by itself, a sufficient engineering criterion.
Performance assessment requires a specified level of earthquake ground motion and a specified building performance target to be defined together. The general provisions of TBDY likewise link the earthquake ground-motion levels and performance targets to be used for existing buildings to the relevant chapters of the Code.
The performance target is not selected after the analysis results are obtained
Before the assessment begins, the performance target should be defined on the basis of the building classification, Seismic Design Class and the relevant regulatory provisions.
Accordingly, although DD-2 + Controlled Damage is a commonly encountered existing-building assessment scenario in practice, it should not be treated as the unconditional and sole performance target for all existing buildings.
The correct approach is:
Seismic demand and the performance target are determined before the assessment in accordance with the building classification and the relevant regulatory provisions.
Building Importance Factor in existing-building assessment
An important provision of Chapter 15 is that the Building Importance Factor is not additionally applied in the performance assessment of an existing building.
TBDY 15.4.2 requires the Building Importance Factor not to be applied in existing-building performance assessment and specifies I = 1.0.
I = 1.0
However, this does not mean that the building use classification is removed entirely from the assessment process.
For example, the Limited Knowledge Level may be used only for buildings within BKS=3. Similarly, building classification and Seismic Design Class are related to determination of the performance target. The I = 1.0 provision concerns the fact that the Building Importance Factor is not additionally applied to the earthquake effect in the seismic assessment carried out under Chapter 15.
This nuance is particularly important for schools, hospitals and similar buildings, so that assumptions used in new-building design are not transferred directly into existing-building performance assessment.
8. Linear or Nonlinear Analysis?
In existing-structure performance assessment, method selection is often framed as:
“Should we run a linear analysis, or do a pushover analysis?”
This is often how the issue is approached.
However, the correct question is:
Which analysis method is applicable to this structure in terms of both the Code and the physical behaviour?
TBDY permits both linear and nonlinear methods for existing-building performance assessment; however, it explicitly states that these methods are based on different theoretical approaches and should not be expected to produce identical results.
Linear methods have limits of applicability
The fact that a linear method can be used does not mean that it is applicable to every building.
TBDY 15.5.3 defines explicit limits of applicability based on conditions such as building height, B3 irregularity and the distribution of member demand-to-capacity ratios. For example, BYS < 5 is one of the conditions that precludes the use of linear analysis methods. If any of these conditions is present, the assessment proceeds using nonlinear methods.
For this reason, linear analysis is not a method selected:
“because it is easier”
to carry out.
A nonlinear method is not automatically more accurate simply because it is more complex
Nonlinear analysis is a powerful assessment tool that allows plastic deformation and rotation demands to be tracked more directly for ductile behaviour, while force demands can be tracked for brittle behaviour.
However, the reliability of the method is not independent of the reliability of the behaviour models and of the existing-structure information on which those models are based.
Nonlinear analysis is not automatically a more accurate analysis simply because it is more complex.
Incorrect geometry, unrealistic hinge properties, erroneous material parameters or unverified member details also affect the results of a sophisticated model.
Method selection should therefore be based not on software capabilities, but on the height, irregularities, modal characteristics and structural system of the building, the quality of the available data, and the requirements of the Code.
9. A Section Result Is Not the Same as Building Performance
Performance analysis produces force and deformation demands for many sections and members.
However, a result read for a single column or beam does not directly represent building performance.
TBDY 15.3 defines three section damage limits for critical sections of ductile members: Limited Damage, Controlled Damage and Pre-Collapse Damage. Comparison with these limits determines the damage regions of the sections; member damage is then defined according to the most severely damaged section of the member.
There is an important terminological distinction here.
Section-level “Pre-Collapse Damage” and building-level “Collapse Prevention Performance Level” are not the same concept.
Because the abbreviations used in the Code may overlap, this technical note deliberately uses the full names when referring to section-level and building-level states.
Section → member → building
The scale changes during performance assessment.
First, the demands at critical sections are assessed.
The damage state of the member is then determined.
The building-level performance decision is subsequently made by considering together the type and distribution of damaged members and the storey/building criteria defined in the Code.
Accordingly:
Member damage is an input to the building-performance decision; it is not the building-performance decision itself.
For example, the fact that a member lies in the Advanced Damage Region does not by itself mean that the building fails to satisfy the Controlled Damage performance level. TBDY 15.8 separately considers the distribution of members and system-level conditions for the building-level decision.
Ductile and brittle behaviour are not assessed in the same way
For ductile behaviour, deformation and rotation capacities are the principal assessment quantities, whereas for brittle behaviour force demands and strength checks are considered separately.
Building performance should therefore not be interpreted solely from coloured hinge or damage-region results.
Collapse Prevention does not mean “suitable for occupancy”
At first glance, the term “Collapse Prevention” may appear to describe a favourable performance outcome.
In fact, this performance level permits an advanced degree of severe damage. TBDY states that even an existing building that satisfies the Collapse Prevention performance level is unsafe for continued occupancy in its current condition from a life-safety perspective. If the Collapse Prevention level is not satisfied, the building is in the Collapse State and its use is likewise unsafe from a life-safety perspective.
Collapse Prevention does not mean an undamaged structure or a structure suitable for continued use without repair.
SEISMIC DEMAND
INTERNAL FORCE / DEFORMATION DEMAND
DUCTILE BEHAVIOUR
deformation
plastic rotation
BRITTLE BEHAVIOUR
internal force
capacity
SECTION / MEMBER RESULT
SECTION DAMAGE REGIONS
LIMITED
SIGNIFICANT
ADVANCED
COLLAPSE
ELEMENT TYPE
+
DAMAGE DISTRIBUTION
+
STOREY CRITERIA
BUILDING PERFORMANCE LEVEL
LIMITED DAMAGE
CONTROLLED DAMAGE
COLLAPSE PREVENTION
COLLAPSE CONDITION
10. How Does Performance Deficiency Translate into a Retrofit Decision?
When an existing structure does not satisfy the target performance, the assessment process should not end with a simple “fail” result.
The key engineering question is:
What is causing the inadequate behaviour?
The same performance result may arise from entirely different mechanisms in different structures.
In one building, the problem may be a local deficiency in column shear capacity.
In another, the deficiency may arise from low global stiffness, torsional behaviour, vertical discontinuities or problems in the load path.
The retrofit strategies applied in these cases should not be the same.
Member-level strengthening and system-level strengthening
TBDY 15.9.3 defines retrofit interventions at two distinct levels: individual members and the building system. Member-level strengthening focuses on increasing the strength or deformation capacity of existing structural members, whereas system-level strengthening encompasses broader interventions such as improving the overall capacity of the structural system, ensuring continuity in internal-force distribution and adding new structural members.
This distinction is not merely terminological.
If the problem arises from system behaviour, strengthening one by one only the members shown in red by the analysis software may not be the most rational solution.
A result map is not a cause analysis
An analysis program may indicate deficiencies in hundreds of members.
This output:
“Where is high demand occurring?”
answers that question.
However:
“Why is high demand occurring here?”
cannot be answered by the output alone.
For example, if many columns on the same storey appear deficient, the stiffness, storey drift, torsion and continuity of the structural system at that storey should be investigated before the columns are enlarged individually.
The deficient members may be the consequence of a system-level problem.
Retrofitting should change behaviour
The objective of retrofit design is not merely to reduce utilisation ratios.
Adding a new shear wall can change not only the strength of the structure, but also its lateral stiffness, periods, force distribution and foundation reactions.
A local intervention to a column, on the other hand, may alter global behaviour very little while preventing a specific brittle failure mechanism.
Two questions should therefore be asked together when making a retrofit decision:
- Which capacity is being increased?
- How is the behaviour of the structure changing?
11. Common Problems in Existing-Building Assessment
A significant proportion of the problems encountered in existing-structure performance studies arise not from the analysis software, but from treating the decisions within the assessment chain as disconnected from one another.
11.1. Relying on archived design documents without verifying them on site.
The design documents are a valuable starting point, but the assessment model should represent the verified existing condition.
11.2. Focusing only on concrete strength.
Concrete strength alone does not define the reinforcement arrangement, confinement, anchorage or the actual deformation capacity of a member.
11.3. Treating reinforcement and connection details as secondary.
Section capacity and the way forces are transferred between members should be assessed together.
11.4. Treating the Knowledge Level as merely a report heading.
The Knowledge Level represents the extent of the information available about the structure and continues to affect the assessment through to member-capacity calculations.
11.5. Transferring new-building design assumptions directly into existing-building assessment.
Chapter 15-specific rules, including existing material strengths, effective stiffnesses, the Knowledge Level and the I = 1.0 provision, must be considered separately.
11.6. Selecting an analysis method without checking its limits of applicability.
Linear methods have explicit limits of applicability; the fact that software can run a method does not mean that the method is permissible under the Code.
11.7. Allowing brittle behaviour to disappear within ductile damage classifications.
Ductile deformation behaviour and brittle strength checks are not the same assessment mechanism.
11.8. Interpreting member damage directly as building performance.
Building performance is determined by assessing member results together with the conditions defined at building scale.
11.9. Assessing model results independently of site observations.
If the analysis result clearly conflicts with the existing physical structure, the geometry, materials, boundary conditions and modelling assumptions should be re-examined.
11.10. Starting retrofit design before identifying the cause of the problem.
A local capacity problem and a global stiffness, torsion or load-path problem do not require the same intervention.
12. Conclusion — Reliable Performance Assessment Begins with Reliable Data
Seismic performance assessment of an existing building is not a matter of entering an existing-building model into structural-analysis software and pressing the command to run the calculation.
The process begins with the structure itself.
The mathematical detail of a model cannot, by itself, provide reliability unless it has first been established how the structural system was actually built, what material and detailing characteristics it has, what changes it has undergone during its service life, and through what load-transfer mechanisms the existing members act.
Performance assessment should therefore be regarded as the outcome of the following integrated chain:
Identification of the existing condition → establishment of the Knowledge Level → determination of materials and details → structural model → seismic analysis → section and member assessment → building performance → engineering decision
Information quality is part of analysis quality
Uncertainty cannot be eliminated completely in the assessment of an existing structure.
However, the source of the uncertainty should be understood and the way in which it is represented in the assessment should be defined.
The Knowledge Level Factor is one means of doing this; the field survey, material testing and identification of member details provide the physical basis of the analytical model. TBDY likewise requires uncertainties in the structural system to be reflected in the analysis methods through Knowledge Level Factors according to the extent of the information compiled.
The analysis method is a tool, not an end in itself
Both linear and nonlinear analysis methods are based on specific assumptions and conditions of applicability.
A more complex analysis does not mean more accurate information.
From an engineering perspective, the primary objective is to represent the behaviour of the structure with a level of reliability appropriate to the assessment problem.
A performance decision is more than a list of members
The results obtained for columns, beams, shear walls or connections at the end of a performance analysis are inputs to the engineering decision.
Building performance emerges from the systematic assessment of these results together.
Similarly, a performance deficiency should not be reduced merely to the question “How many members fail?”
The real value lies in the answer to the question:
“Why is the structure behaving this way?”
That answer is where the engineering value lies.
Even the most detailed analysis model in existing-structure assessment cannot, by itself, guarantee a reliable engineering conclusion if the actual geometry, materials, member details and structural system have not been defined with sufficient reliability.
Seismic performance assessment is an integrated process in which site investigation, testing, engineering modelling, analysis and structural interpretation complement one another.
The analysis result is not the end of this process.
It is one of the stages through which the actual behaviour of the structure is translated into an engineering decision.
SCOPE NOTE
This technical note has been prepared to explain the fundamental engineering approach to seismic performance assessment of existing buildings. The scope of information gathering, number of tests, conditions governing the analysis method, performance criteria and retrofit decisions should be determined on a project-specific basis in accordance with the applicable provisions of the relevant regulations.
STANDARDS & REFERENCES
Turkish Building Earthquake Code (TBDY 2018)